PORT OF TILBURY BATTERY ENERGY STORAGE SYSTEM

CLIENT: Kirby Group Engineering

VALUE: £740,000.00

SECTOR: Battery Storage

LOCATION: Port of Tilbury

SCOPE OF WORKS:

Tilbury 1.JPG

Woodlawn Group were responsible for the Civils, Building and Landscaping Works for a new build battery energy storage at the Port of Tilbury, Essex.

This included Site Clearance including contaminated Soils, Piling Foundations, Earthing, Drainage and Utilities including a road and Rail (UTX) crossing to allow connection to Tilbury 11kV Substation,

all concrete Works and Palisade fencing. Woodlawn carried out the project on time and without incident. We also had valuable input into the Civils Design.


BRENTWOOD BATTERY ENERGY STORAGE SYSTEM

CLIENT: Kirby Group Engineering

VALUE: £1,100,000.00

SECTOR: Battery Storage

LOCATION: Lower Road, Brentwood

SCOPE OF WORKS:

Woodlawn Group were responsible for the Civils, Building and Landscaping Works for a new build battery energy storage at Lower Road, Brentwood.

This included Bulk Excavation, Earthing, Drainage including the installation of an Attenuation Tank, Utilities including a road crossing to allow connection to Shenfield 110kV Substation, all concrete Works, roadways, Palisade fencing
and the construction of the 33kV DNO Building.

Woodlawn carried out the project within an accelerated programme and without incident. We also had valuable input into the Civils Design.

Brentwood 1.jpg
Brentwood 2.jpg